Case studies

Kemps Creek Revegetation Success

Kemps Creek, NSW

The challenge

Western Sydney is well known for its nutrient-poor soils, which can make establishing vegetation on disturbed sites a persistent challenge – particularly on large infrastructure projects where timing, compliance and visual outcomes matter.

At Kemps Creek, QuickWay was tasked with stabilising and revegetating a recently disturbed area using a solution that would deliver rapid, reliable growth without relying on topsoil or extended maintenance programs.

The solution

To address the difficult soil conditions, the project was treated with BFM Complete – a high-performance Bonded Fibre Matrix that includes soil conditioners and beneficial biology as part of an all-in-one application.

BFM Complete was selected for its ability to:

  • Bind the surface layer to reduce erosion risk
  • Improve soil structure and water retention
  • Stimulate seed germination and early plant growth, even in compacted or depleted subsoils.

Favourable weather following the application supported strong early germination, with vegetation cover quickly establishing across the site.

The results

The site responded exceptionally well to the BFM Complete treatment, with early-stage vegetation cover exceeding expectations – especially considering the known challenges of the local soils.

QuickWay reported strong performance and a very happy client, with visible results drawing attention from neighbouring contractors.

“As you know, the Western Sydney soils aren’t the best, but with the application of BFM Complete and some good weather, we have had great success! The client is very happy!” – QuickWay.

The Kemps Creek project demonstrated that BFM Complete can deliver strong germination and reliable soil stabilisation even under challenging conditions. The treatment proved effective without the need for topsoil or extensive soil preparation, making it a practical and efficient solution for difficult sites. The result was not only a visually impressive outcome within a short timeframe, but also a high level of client satisfaction – highlighting the value of BFM Complete in fast-tracking successful revegetation.

Revegetation in Western Sydney’s poor soils? It can be done – with the right solution.